Control the work before it is covered

Quality and safety are integral to delivery planning, not separate activities.

Structural work inspection

A clear system for inspection, documentation and closeout

Each stage follows approved information, checks of materials, setting-out, dimensions and hold points, followed by documented closeout before the next activity.

Approved information

Work follows approved drawings, materials and procedures.

Documented inspections

Inspection outcomes and observations are recorded and closed.

Defined hold points

Work is not covered before the required inspection is complete.

Planned safety

Safety requirements are integrated into daily activity planning.